Post IP Defect Repair by Sectional Replacement on 20-inch TRP
Pipeline Repair

Post IP Defect Repair by Sectional Replacement on 20-inch TRP

Location: Odimodi, Bayelsa State, Nigeria

Client: Renaissance Africa Energy Company Limited

Work Stages: Mobilization to Swamp; Monkey Access Creation; Work Site Access Creation; Pilling; Cofferdam Construction; Cofferdam Completed; IC Point Blinded

Preview Photo
IC Repair by Split-Tee Using Cofferdam on 20-inch TEP
Pipeline Repair

IC Repair by Split-Tee Using Cofferdam on 20-inch TEP

Location: Otumara, Delta State, Nigeria

Work Stages: Transfer of Materials Back to Water Front; Back Loading; Site Restored; Demobilization to Base; Repair Section Decoated; Grouting; Inside Cofferdam; Welded Split Tee; X-Ray Examination; Sleeve Wrapped Welded Split Tee; Cofferdam Extraction; Extraction of Cofferdam Frame

Preview Photo
Corrosion Control by Water Jetting and Spray Painting
Corrosion Control

Corrosion Control by Water Jetting and Spray Painting

Location: Ologbo Gas Plant, Edo State, Nigeria

Client: NPDC

Work Stages: Water Jetting in Progress; Surface Preparation Completed; Application of Primer Painting; Spray Painting in Progress

Preview Photo
IC Repair by Clamp Welding on the 8-inch Adibawa–Gbaran CPF Gas Line
Pipeline Repair

IC Repair by Clamp Welding on the 8-inch Adibawa–Gbaran CPF Gas Line

Location: Ikarama

Client: Renaissance Africa Energy Company Limited

Work Stages: Mobilization to Site; Exposed IC Point; Plugging/Sealing of IC Point; Clamp Installation; Non-Destructive Test Completed

Preview Photo
Welded Pipeline Repair Job
Pipeline Repair

Welded Pipeline Repair Job

Work Stages: Welding in Progress; NDT on Welded Joint (Final MPI); Coating of the Clamp; Demobilization of Tools and Equipment

Preview Photo
Real Estate Multi-Building Construction
Construction

Real Estate Multi-Building Construction

Location: Effurun, Warri, and Udu, Delta State, Nigeria

Scope: Residential estate buildings and duplex developments

Preview Photo
Positive Isolation of the 24-inch TRP
Pipeline Work

Positive Isolation of the 24-inch TRP

Location: Ogidigben – Escravos

Client: Renaissance Africa Energy Company Limited

Work Stages: Toolbox Meeting

Preview Photo
Positive Isolation of the 20-inch and Valve Integration on the 24-inch TRP at Ogidigben Manifold
Pipeline Work

Positive Isolation of the 20-inch and Valve Integration on the 24-inch TRP at Ogidigben Manifold

Location: Ogidigben – Escravos

Client: Renaissance Africa Energy Company Limited

Work Stages: Unbolting and Retrieval of Gasket; Spading and Positive Isolation in Progress; Fitup and Welding of Weldolet and WN Flange; Installation of 2-inch Valve on 24-inch TEP; Completed Installation of 2-inch Valve on 24-inch TEP; De-spading and Restoration Completed; Equipment Demobilization

Preview Photo
Post IP Defect Repair by Sectional Replacement on 24-inch TEP
Pipeline Repair

Post IP Defect Repair by Sectional Replacement on 24-inch TEP

Location: Ogidigben – Escravos

Client: Renaissance Africa Energy Company Limited

Work Stages: Mobilization of Materials and Equipment to Site; Load Out/Transfer of Materials and Equipment to Site; Linear/Reference Spool Measurements; Defect Verification and PAUT on Defect/Tie-in Points; Excavation to Reveal Defective Spool; Cutting/Salvaging of Existing Defective Spool; Lowering/Fit Up of Replacement Spool for Welding; Completed Welding of US/DS Tie-in Joints; X-Ray on Welded US/DS Tie-in Joints; Sleeve/Concrete Coating of Welded Tie-in Joints; Back Filling and Site Restoration; Backloading of Equipment/Demobilization

Preview Photo
Partner With Us

Need a reliable partner for pipeline, corrosion control, or construction projects?

Close contacts and excellent cooperation between customer and contractor is the basis for high quality, ensuring that the final result meets project expectations and timely delivery.

Discuss Your Project
Aquilagalaxy Solutions logo

Office

info@aquilagalaxy.com

aquilgalaaxy1@gmail.com

Admin