Pipeline Repair
Post IP Defect Repair by Sectional Replacement on 24-inch TEP
Location: Ogidigben – Escravos
Client: Renaissance Africa Energy Company Limited
Work Stages: Mobilization of Materials and Equipment to Site; Load Out/Transfer of Materials and Equipment to Site; Linear/Reference Spool Measurements; Defect Verification and PAUT on Defect/Tie-in Points; Excavation to Reveal Defective Spool; Cutting/Salvaging of Existing Defective Spool; Lowering/Fit Up of Replacement Spool for Welding; Completed Welding of US/DS Tie-in Joints; X-Ray on Welded US/DS Tie-in Joints; Sleeve/Concrete Coating of Welded Tie-in Joints; Back Filling and Site Restoration; Backloading of Equipment/Demobilization